
[May-2026] The Best SAP Certified Associate Study Guide for the C-P2W43-2023 Exam
C-P2W43-2023 certification guide Q&A from Training Expert PrepPDF
NEW QUESTION # 41
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question
- A. SAP Work Manager
- B. SAP Service and Asset Manager (formerly SAP Asset Manager)
- C. SAP Asset Performance Management
- D. Worker Safety applications
Answer: B,C
NEW QUESTION # 42
You want to display vehicle-specific data for a piece of equipment. How do you proceed?
- A. Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories".
- B. Assign a view profile to the combination of equipment category and vehicle class.
- C. Assign a view profile to an equipment category for fleet equipment.
- D. Assign a view profile to the combination of vehicle type and equipment category.
Answer: D
NEW QUESTION # 43
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question
- A. Display maps Display and maintain technical objects
- B. Change BOM Create a work order on the ESRI map
- C. Schedule resources Change task list
- D. Confirm time sheets Attach documents
Answer: A,D
NEW QUESTION # 44
How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question
- A. By assigning a PFCG role with an SAP Fiori tile group
- B. By assigning the tiles directly
- C. By assigning a portal role with an SAP Fiori catalog
- D. By assigning a PFCG role with an SAP Fiori catalog
Answer: A,D
NEW QUESTION # 45
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question
- A. Start counter reading
- B. Estimated annual performance
- C. Counter overflow reading
- D. Scheduling period
Answer: A,B
NEW QUESTION # 46
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question
- A. In the material reservation list in inventory management
- B. In the list editing (single-level) for maintenance orders
- C. Within a maintenance order
- D. In the report Material: Where-Used List
Answer: C,D
NEW QUESTION # 47
What happens if you change the primary key of a functional location?
- A. The user must decide whether the functional location is assigned to a new superior functional location.
- B. The user must define a new labelling system for the new primary key.
- C. Changing the superior functional location via alternative labeling is not possible.
- D. The functional location cannot be assigned to a new superior functional location when the new label is entered.
Answer: D
NEW QUESTION # 48
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question
- A. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant
- B. Assign an Inspection Type to a Maintenance Order Type.
- C. Maintain settings at plant level for usage decisions.
- D. Create a control key which expects inspection characteristic assignments
Answer: B,C
NEW QUESTION # 49
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?
- A. Call horizon
- B. End Date for Scheduling
- C. Scheduling period
- D. Scheduling indicator
Answer: C
NEW QUESTION # 50
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question
- A. SAP Business Objects as a part of SAP Business Warehouse (BW)
- B. Preconfigured Core Data Service (CDS) containing SQL views
- C. A collection of tools that are not included with core SAP S/4HANA
- D. SAP Business Objects Business Intelligence for Visualization
Answer: A,B
NEW QUESTION # 51
What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.
- A. The call date for the maintenance order
- B. The first due date of a maintenance package
- C. A one-time shift of a maintenance package
- D. A preliminary buffer shifting the reference date of the maintenance order
Answer: B
NEW QUESTION # 52
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Technical completion date of the maintenance order
- B. The date of the final confirmation
- C. Actual finish date of the maintenance order
- D. Planned date of the next call, independent of maintenance order dates
Answer: A
NEW QUESTION # 53
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Activate the change documents for the equipment category.
- B. Define history related fields in the usage period customizing.
- C. Define the corresponding history related field for the equipment reference category.
- D. Activate the change documents for the equipment reference category.
Answer: A,B
NEW QUESTION # 54
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?
- A. It always uses the risk-based assessment for prioritization.
- B. It is a new business object with no connection to a maintenance notification.
- C. It contains an additional screening phase where requests can be accepted or rejected.
- D. It is mandatory to assign a task list to the maintenance request.
Answer: C
NEW QUESTION # 55
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question
- A. Release Start Work
- B. Release Print
- C. Complete Close Report
- D. Schedule Dispatch
Answer: A,C
NEW QUESTION # 56
You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question?
- A. Transactions
- B. Web Dynpro Apps
- C. Catalogs
- D. Tile Groups
Answer: C,D
NEW QUESTION # 57
Which steps are available for the maintenance technician when using the Report Malfunction bile? Note: There are 3 correct answers to this question.
- A. View details of the technical object by navigating to the Asset Viewer
- B. Select and print the maintenance order shop papers
- C. Display the current location of the technical object
- D. Add a URL to provide further information
- E. Input estimated costs for repair malfunction
Answer: A,C,D
NEW QUESTION # 58
You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?
- A. For stock material you always need a reservation
- B. Material can be assigned at the order header level.
- C. The pick list for materials can be printed before order release.
- D. A goods issue can be entered for planned and unplanned material
Answer: A,D
NEW QUESTION # 59
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by ((scheduling period) x (cycle modification factor))
- B. Cycle length divided by (annual performance/365)
- C. Cycle length divided by annual performance
- D. Cycle length divided by (monthly performance x 12)
Answer: C
NEW QUESTION # 60
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question
- A. Warranty category
- B. Usage period
- C. Status profile
- D. Object information
- E. Measuring point category
Answer: C,D,E
NEW QUESTION # 61
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.
- A. The controller can determine actual cost surcharges.
- B. The planner can change estimated costs only at the header level
- C. The assignment of the notification to the maintenance order header cannot be deleted.
- D. Goods receipts for external services can be entered.
- E. The planner can change planned costs at the operation level
Answer: A,D,E
NEW QUESTION # 62
How can you assign a material BOM to a piece of equipment?
- A. Via field construction type
- B. Via creation of an equipment BOM
- C. Via field model number in the equipment master
- D. Via material BOM header in the serialization data
Answer: A
NEW QUESTION # 63
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question
- A. It defines the allowed characters for a functional location
- B. It restricts the number of hierarchical levels to no more than 6
- C. It sets the hierarchy levels of the functional location structure.
- D. It limits the types of characters in the edit mask to Alpha and Numeric.
Answer: C,D
NEW QUESTION # 64
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question
- A. The configuration of the order type decides whether you use Resource Scheduling or not.
- B. The order moves to the Preparation phase once it is approved and released
- C. Maintenance Planning Buckets give you a list of non-approved notifications
- D. If you use the Resource Scheduling apps, you always dispatch orders and operations.
Answer: B,D
NEW QUESTION # 65
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?
- A. Via the SAP Fiori app "Manage Maintenance Order List"
- B. Within the SAP Fion-based background job
- C. Via the SAP Fiori app "Maintenance Scheduling Board"
- D. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
Answer: A,C
NEW QUESTION # 66
......
The Best SAP C-P2W43-2023 Study Guides and Dumps of 2026: https://measureup.preppdf.com/SAP/C-P2W43-2023-prepaway-exam-dumps.html